NCDENR Codes
6.01 Construction Sequence Schedule
6.02 Land Grading
6.03 Surface Roughening
6.04 Topsoiling
6.05 Tree Preservation and Protection
6.06 Temporary Gravel Construction Entrance/Exit
- SURFACE STABILIZATION– Updated May 2013
6.10 Temporary Seeding
6.11 Permanent Seeding
6.12 Sodding
6.13 Trees, Shrubs, Vines, and Ground Covers
6.14 Mulching
6.15 Riprap
6.16 Vegetative Dune Stabilization
6.17 Rolled Erosion Controlled Products
6.18 Compost Blankets
III. RUNOFF CONTROL MEASURES – Updated May 2013
6.20 Temporary Diversions
6.21 Permanent Diversions
6.22 Diversion Dike (Perimeter Protection)
6.23 Right-of-Way Diversions (Water Bars)
6.24 Riparian Area Seeding
6.30 Grass-Lined Channels
6.31 Riprap and Paved Channels
6.32 Temporary Slope Drains
6.33 Paved Flume (Chutes)
6.40 Level Spreader
6.41 Outlet Stabilization Structure
6.50 Excavated Drop Inlet Protection (Temporary)
6.51 Hardware Cloth and Gravel Inlet Protection (Temporary)
6.52 Block and Gravel Inlet Protection (Temporary)
6.53 Sod Drop Inlet Protection
6.54 Rock Doughnut Inlet Protection
6.55 Rock Pipe Inlet Protection
VII. SEDIMENT TRAPS AND BARRIERS – Updated May 2013
6.60 Temporary Sediment Trap
6.61 Sediment Basin
6.62 Sediment Fence (Silt Fence)
6.63 Rock Dam
6.64 Skimmer Sediment Basin
6.65 Porous Baffles
6.66 Compost Sock
6.70 Temporary Stream Crossing
6.71 Permanent Stream Crossing
6.72 Vegetative Streambank Stabilization
6.73 Structural Streambank Stabilization
6.74 Buffer Zones
6.80 Construction Road Stabilization
6.81 Subsurface Drain
6.82 Grade Stabilization Structure
6.83 Check Dam
6.84 Dust Control
6.85 Sand Fence (Wind Fence)
6.86 Flocculants
6.87 Check Dam with Weir
NCDOT Codes
1640.01 Coir Fiber Baffles
1630.06 Special Stilling Basins
1607.01 Gravel Construction Entrance
1606.01 Special Sediment Control Fence
1605.01 Temporary Silt Fence
1604.01 Railroad Erosion Control Detail
CharMeck Codes
30.00 | Special Erosion Control Requirements & Notes | |
30.01 | Temporary Sediment Trap | |
30.02A | Skimmer Sediment Basin | |
30.02B | Skimmer | |
30.03A | Sediment Basin | |
| 30.03B | General Notes – Sediment Basins |
| 30.04 | Flexible Pipe Slope Drain |
30.05 | Temporary Silt Ditch | |
30.06A | Temporary Silt Fence | |
30.06B | High Hazard Temporary Silt Fence | |
30.07 | Block and Gravel Stone Inlet Protection | |
30.08 | Stone Inlet Protection | |
30.09 | Hardware Cloth and Gravel Inlet Protection | |
30.10 | Temporary Rock Check Dam | |
30.11A | Stabilized Construction Entrance | |
30.11B | Construction Entrance Tire Wash | |
30.11C | Construction Entrance – Single Family Lot | |
30.12 | Gravel and Rip Rap Filter Berm Basin | |
30.13 | Erosion Control Dewatering | |
30.14 | Temporary Stream Crossing | |
30.15 | Catch Basin Inlet Protection | |
30.16 | Slope Stability | |
30.17 | Temporary Seeding Schedule | |
30.18 | Construction within Creek Bank | |
30.19 | Baffle Installation | |
30.20 | Embankment Matting Detail | |
30.21 | Brick Storm Structure with Temporary Pipe |