• CharMeck Codes
  • NCDENR Codes
  • NCDOT Codes

 

pdf

30.00

Special Erosion Control Requirements & Notes

pdf

30.01

Temporary Sediment Trap

pdf

30.02A

Skimmer Sediment Basin

pdf

30.02B

Skimmer

pdf

30.03A

Sediment Basin

 

pdf

 

30.03B

General Notes – Sediment Basins

 

pdf

 

30.04

Flexible Pipe Slope Drain

pdf

30.05

Temporary Silt Ditch

pdf

30.06A

Temporary Silt Fence

pdf

30.06B 

High Hazard Temporary Silt Fence

pdf

30.07

Block and Gravel Stone Inlet Protection

pdf

30.08

Stone Inlet Protection

pdf

30.09

Hardware Cloth and Gravel Inlet Protection     

pdf

30.10

Temporary Rock Check Dam

pdf

30.11A

Stabilized Construction Entrance

pdf

30.11B

Construction Entrance Tire Wash

pdf

30.11C

Construction Entrance - Single Family Lot

pdf

30.12

Gravel and Rip Rap Filter Berm Basin

pdf

30.13

Erosion Control Dewatering

pdf

30.14

Temporary Stream Crossing

pdf

30.15

Catch Basin Inlet Protection

pdf

30.16

Slope Stability

pdf

30.17

Temporary Seeding Schedule

pdf

30.18

Construction within Creek Bank

pdf

30.19

Baffle Installation

pdf  

30.20

Embankment Matting Detail

pdf

30.21

Brick Storm Structure with Temporary Pipe

​​​

 

I. SITE PREPARATION

6.01 Construction Sequence Schedule

6.02 Land Grading

6.03 Surface Roughening

6.04 Topsoiling

6.05 Tree Preservation and Protection

6.06 Temporary Gravel Construction Entrance/Exit

II. SURFACE STABILIZATION - Updated May 2013

6.10 Temporary Seeding

6.11 Permanent Seeding

6.12 Sodding

6.13 Trees, Shrubs, Vines, and Ground Covers

6.14 Mulching

6.15 Riprap

6.16 Vegetative Dune Stabilization

6.17 Rolled Erosion Controlled Products

6.18 Compost Blankets

 III. RUNOFF CONTROL MEASURES - Updated May 2013

6.20 Temporary Diversions

6.21 Permanent Diversions

6.22 Diversion Dike (Perimeter Protection)

6.23 Right-of-Way Diversions (Water Bars)

6.24 Riparian Area Seeding 

IV. RUNOFF CONVEYANCE MEASURES

6.30 Grass-Lined Channels

6.31 Riprap and Paved Channels

6.32 Temporary Slope Drains

6.33 Paved Flume (Chutes)

V. OUTLET PROTECTION

6.40 Level Spreader

6.41 Outlet Stabilization Structure

VI. INLET PROTECTION

6.50 Excavated Drop Inlet Protection (Temporary)

6.51 Hardware Cloth and Gravel Inlet Protection (Temporary)

6.52 Block and Gravel Inlet Protection (Temporary)

6.53 Sod Drop Inlet Protection

6.54 Rock Doughnut Inlet Protection

6.55 Rock Pipe Inlet Protection

VII. SEDIMENT TRAPS AND BARRIERS - Updated May 2013

6.60 Temporary Sediment Trap

6.61 Sediment Basin

6.62 Sediment Fence (Silt Fence)

6.63 Rock Dam

6.64 Skimmer Sediment Basin

6.65 Porous Baffles

6.66 Compost Sock 

VIII. STREAM PROTECTION

6.70 Temporary Stream Crossing

6.71 Permanent Stream Crossing

6.72 Vegetative Streambank Stabilization

6.73 Structural Streambank Stabilization

6.74 Buffer Zones

IX. OTHER RELATED PRACTICES

6.80 Construction Road Stabilization

6.81 Subsurface Drain

6.82 Grade Stabilization Structure

6.83 Check Dam

6.84 Dust Control

6.85 Sand Fence (Wind Fence)

6.86 Flocculants

6.87 Check Dam with Weir

 

NCDOT North Carolina Department of Transportation

 

1640.01 Coir Fiber Baffles

1630.06 Special Stilling Basins

1607.01 Gravel Construction Entrance

1606.01 Special Sediment Control Fence

1605.01 Temporary Silt Fence

1604.01 Railroad Erosion Control Detail